Energoutil Limited liability company implements a project co-financed from European Funds

“Construction of a biogas plant in Nowa Wieś Ełcka.”

The project is implemented on the premises of the existing plant, which is located in Nowa Wieś Ełcka, at ul. Ełcka 1A, 19-300 Ełk.
As part of the project, a biogas plant with auxiliary devices will be built, as well as a 5MWt gross gas boiler plant, where water vapor, directed further to the existing cogeneration node.
As a result of changing the energy source, the capacity utilization of the existing cogeneration node will increase and will increase installation efficiency. The raw material used for biogas production will be mainly animal waste.
The goals of the project are:

  • increasing the utilization of existing capacities in the field of electricity production,
  • increasing the efficiency of the cogeneration plant at the plant,
  • increasing renewable energy production,
  • reduction of emissions of harmful substances into the atmosphere.
The total investment cost is approx. PLN 36 million net.

Financing:
by the European Union from the funds of the Regional Operational Program of the Warmian-Masurian Voivodeship in the amount of PLN 24 912 864.21
and own contribution in the amount of PLN 10 682 026.79.